Quality, laboratory and environment
Controlled production to IATF 16949:2016 and ISO 9001:2015, with in-house testing and wastewater treatment.
LABORATORY
Tests we run in-house
Our laboratory carries out periodic analysis of every plating solution alongside the tests below. Results are supplied to customers as a report.

Laboratory equipment

Microscope 
Climatic chamber and drying oven 
CASS (salt spray) test chamber
Solution analysisPERIODIC
Every bath is analysed on a schedule so problems are prevented before they reach parts.Hull-cell testBATH
Checks plating behaviour of the solution across a range of current densities.Cross-cut testADHESION
Verifies adhesion of the metal layers to the plastic substrate.CASS-SST testSALT SPRAY
Exposes parts to a corrosive atmosphere to confirm protection.Thermal Cycle testCYCLING
Checks coating integrity under temperature and humidity changes.Coating thickness & STEPCOULOSCOPE
Measures the thickness of each layer and the potential difference between nickel layers.Micropore countMICROSCOPY
Confirms the pore density of microporous nickel systems.
ENVIRONMENT
100 m³WASTEWATER TREATED PER DAY
Our fully automatic treatment plant, designed to current technology, treats 100 m³ of wastewater a day. Treated water is discharged to the sewer under a permit from the Ministry of Environment.


